referenz03

Remodeling a bank branch

We were commissioned with the complete dry construction work on this property.
The first step was to produce a vapor-tight false ceiling, which was then covered with cellulose after the sound and heat insulation.
This suspended ceiling was the structure for all further work on this project. Overall, this suspended ceiling had to withstand a total load of 5 tons and at the same time served as an installation level between the GK ceiling below.

This was followed by a suspended plasterboard ceiling with several perforated panels and some drywall.

This was followed by the construction of the vault for the pay machines, which was constructed taking into account applicable DINs and standards.


Drywall

Share by: